110 Island Rd, Suite D, Circleville, OH  43113
Phone: 740-477-1693  Fax: 740-477-3327

Home
Staff & Supervisors
News
Calendar
Soils
Photos of Conservation Practices
Designing Conservation Practices
Education
Pickaway Art
Ditch Maintenance
Equipment Rental
Contractors
Downloadable Documents
Annual Report
Land Use Plans
Ohio Drainage Laws

 

Designing Conservation Practices
Installation of plastic tubing The Pickaway SWCD has several talented technicians to help you plan and develop your conservation practice.

Subsurface drainage plans require a $3.00 per acre deposit ($100.00 minimum).

Engineering plans for all other conservation practices require a $100.00 deposit ($300.00 for group ditches).

Deposits will be returned if the practice is installed within two years of the receipt of the plan.

View and Print the "Conservation Engineering Practice Agreement" on the Documents page.

(Installation of plastic drainage tubing)
 

 

[Home] [ News] [Staff/Supervisors] [Contractors] [Ditch Maintenance] [Designing Conservation Practices]
[Equipment Rental] [Annual Report] [Conservation Education] [Calendar] [Photos of Conservation Practices] [Downloadable Documents] [Land Use Plans]